Design-Build

window replacement in burlingame california amerail systems

SINGLE

SOURCE

pexels-photo-1249158.jpeg

FASTER PROJECT COMPLETION

18157026859000890.jpg

VALUE ENGINEERING

hotel Check In

QUALITY CONTROL

pexels-photo-7931.jpg

ENHANCED COMMUNICATION

Leveraging Design-Build Services for the Hotel Industry for over 35 Years. 

From simple exterior upgrades like painting or a new porte-cochere to an entire hotel brand conversion, Amerail Systems has the design-build experience to understand exactly what the hotel industry needs.

We've successfully completed exterior hotel renovations for thousands of hotels throughout the country, led by skilled staff who have an intimate knowledge of all aspects of hotel design-build projects, from early stage architectural drawings through post-construction.

 

We offer quick solutions to unplanned situations. 

The design-build approach provides a single source for your entire project.  Our design-build method fosters teamwork and lends itself to cooperation. The relationship built during the design phase helps to ensure that the stage is set for a successful construction project.

Compared to the traditional bid-build method where the owner must: select an architect/designer, finalize the design, bid the project, select a contractor, and then act as an intermediary. 

SINGLE SOURCE OF ACCOUNTABILITY

 
 

FASTER PROJECT

COMPLETION

Design-build projects can be completed in a shorter amount of time because: Bid time is reduced, scheduling for the project can begin before the design is finalized, potential construction problems are uncovered early and enhanced communication keeps

everything moving.

 

VALUE ENGINEERING

  Specific design and construction 

details are being developed throughout 

the entire process and the focus stays on owner “value”.  The communication benefits of working with a design professional and a construction expert at the same time ensures that potential problems are discovered before the project starts.

 

QUALITY CONTROL

ENHANCED 

COMMUNICATION

The design build method helps to remove ambiguity that may arise in material and construction specifications. Since the designer, engineer and builder are from the same firm, the focus remains on protecting the client's interest.

 

Ready for a better

design-build renovation?

Discussing budget during the design phase (not waiting until the bids come in) helps to keep the projects within a realistic budget.  Communicating the cost implications of design decisions ensures that the owner plays a key role in arriving at the final project price.  Once the scope of work has been finalized, the project costs are clearly defined and controlled by the design/build firm.